24.09.2021 - Next Project in commissioning stage in the southern part of Turkey with a single 4 Nozzle Pelton Unit 8,5 MW.
Kochendoerfer Hydro
 
23.01.2024 First shipment in 2024 from Kochendörfer goes to the north-eastern part of of 🇹🇷 with this 6 Nozzle Pelton Turbine which will generate green energy in the future
23.01.2024 Kochendörfer Hydro started the installation activities of the Middle Mewa Khola Hydroelectric Power Plant Project in Nepal with Pelton Turbine with a capacity of 3×25MW. And the first turbine housing was successfully lowered into the pit.
26.12.2023 Installation works of the 2 vertical Pelton turbines had started at Serra de Agua HEPP in Portugal, where Kochendörfer produced and delivered the Hydroelectric Equipment for the rehabilitation of the Powerplant
26.12.2023 Site is ready for installation in Nepal, to place the 3 vertical Kochendörfer Pelton Turbines with a total installed capacity of 73 MW
24.08.2023 Wicket gate on the way to Austria, Runner will follow soon for Verbund HPP Gratkorn in Graz City 2 vertical Kaplan Turbines 5,65 MW
02.08.2023 KW Gratkorn is ready for 2 machine sets! Wall paint included.
13.07.2023 In order to provide the best quality to our customers, the first 6 containers (300 tons in total) of turbine equipment set out for 49 MW HEPP Middle Mewa Khola in Nepal from our Kochendörfer production factory, where we manufacture all turbine components
12.06.2023 Full-Load test at Arac HEPP (2x 3 MW) in 🇹🇷 successfully completed. Thanks to the client for the trust in us as well as thanks to our partners ERMAF Automation and TDPS for the excellent cooperation.
20.04.2023 Next powerplant, equipped with a single 10.2 MW 6 nozzle Kochendörfer Hydro Pelton turbine, is ready for commissioning on a remote area in Turkey.
03.03.2023 0,5 MW Hydropowerplant commissioned in Austria where Kochedörfer supplied the vertical Kaplan Turbine incl. all auxiliaries, installation and commissioning! All components had been produced in our own manufacturing facilities, which ensures a high quality
28.02.2023 Ceremonial inauguration of HPP Zilfuri for the Kandersteg City in Switzerland. After only one year from order the new Powerplant was commissioned with one 2 nozzle Pelton Turbine 1,8 MW.
28.02.2023 One year ago we have shared the puctures from the successful model test for the new powerplant Gratkorn in City of Graz Austria. Now first big parts reach the site.
07.02.2023 This 7 Francis turbines, with a total capacity of 24 MW, Kochendörfer produced for a cascade Project in Albania had successfully passed the FAT and are ready for shipment.
31.01.2023 Recently we produced, delivered and commissioned a small 3 nozzle Pelton with 0,5 MW in the Austrian Alps.
02.01.2023 We wish all of you the best and luck for 2023 and want to thank all our customers as well as employees for their cooperation and contribution through out the year 2022!
02.01.2023 Last shipment in 2022, with a 10 MW Pelton Turbine housing, left our Kochendörfer Factory in Ankara and is on the way to its final destination at the eastern part of
29.11.2022 Recently we shipped the first parts for a vertical Kaplan Turbine, where our qualified Kochendörfer staff could proove again their accurate working skills.
11.11.2022 The revision of the first 3 units in Otluca 1/2 was successfully completed and all units were successfully re-commissioned by the Kochendörfer Hydro Team in really great cooperation with AKFEN, the owner of these Power Plants.
05.08.2022 1 more unit of Otluca 2 has been dismantled and transferred to factory for refurbishment works.
02.07.2022 Otluca 1 and Otluca 2 disassembly works are covered by the Kochendörfer Hydro 🇹🇷 site team in the first units. The parts will now be checked for reassembly.
01.07.2022 Both of Kochendörfer manufacturing facilities in 🇩🇪 and 🇹🇷, are using PV on their factory roofs in order to be autarkic and use their own produced energy in their facilities to manufacture environmentally friendly hydro turbine
12.06.2022 Inauguration ceremony for the Do aukraftwerk Fridingen. After 99 years in operation the Turbines and the complete plant technic was renewed with 3 new vertical Francis machines from KD ! The new Turbines was integrated in the existing historical Building
06.06.2022 Installation of the solar panels started on our factory roof at Kochendörfer Hydro in Ankara 🇹🇷, where we will very soon be able to produce clean energy from the sun and cover more then 80 of our energy demand with this step.
04.04.2022 We are proud that we could sign the contract for the 73,5 MW project in Nepal. Thanks to our client for the trust in us. Now the real works start.
04.04.2022 Commissioning of all 4 vertical Kaplan units at 22 MW Duru HEPP in Turkey successfully completed .
04.04.2022 We are on HYDRO 2022 Nepal, Kathmandu ! It’s our pleasure to meet you. Visit us
23.03.2022 Commissioning of the first Unit in Almus HEPP completed, where Kochendörfer developed and produced a new Francis runner in order to improve the efficiency and also widen the operation range.
23.03.2022 In Yagmur HEPP Kochendörfer completed the overhaul works on the WG-Cover, TU-Cover as well as the runner of the first Unit.
13.01.2022 As 2021 is almost over, we use the opportunity for saying thanks to all our employees, customers as well as suppliers which made this amazing success possible.In this regard, we wish all of you the best for 2022.
17.12.2021 For Almus HEPP in Turkey, KD Hydro received last year the order for optimizing the 3 existing Turbines (each 10,8 MW) which were built in the sixties and after detailed analysis as well as developing a suitable hydraulic profile
11.12.2021 Kochendörfer Hydro could again prove its expertise also in the refurbishment and repair segment of older turbines, with successful completing the first of 2 Francis units at a Project in the northern part of Turkey
22.11.2021 The next KD Model Turbine is already shiped to the test bench of University of Graz. Test with the new improved Kaplan design will start soon. We expect a significant increasing of the performance for low head Kaplan projects.
16.11.2021 The move to our new turbine manufacturing facility in Ankara has been completed and manufacturing is in full swing for new hydropower turbines as well as overhaul of existing plants.
15.11.2021 Also the last unit in Cökek had been accepted from the ministry of energy. All units, Cökek 1 and 2 are now in operation thanks also to the client Akmercan as well as the co-operation partners in this project
16.10.2021 2x5MW Francis Turbine is Ready for Commissioning
15.10.2021 Second 3,2 diameter runner lowered into it’s final destination of this 22 MW powerplant in Turkey 🇹🇷 equipped with 4 vertical Kochendörfer Kaplan turbines.
14.10.2021 Runner produced in our Turkey factory is ready for shipment to generate 8 MW of Energy
13.08.2021 Özgüven 2 commissioning and acceptance successful completed in Artvin-Yusufeli where we delivered one horizontal Francis Turbine
12.08.2021 2-Nozzle Kochendörfer Hydro Pelton Turbine at Hanli HEPP Had Been Commissioned And Accepted By the Ministry of Energy !
11.08.2021 Next Project in commissioning stage, where Kochendörfer Hydro supplied 2 Francis turbines
18.06.2021 The 1 MW Kochendörfer HydroPower-Box, equipped with a one-nozzle Unit Pelton for a high head project in Turkey left today our Workshop and is on the road
17.06.2021 Also Kizilcapinar HEPP, equipped with one large and one small Kochendörfer Hydro Francis Turbine, passed the ministry acceptance Tests successfully and is already on the grid
16.06.2021 Ayvadere HEPP, one compact vertical Kaplan turbine, had been successful accepted from the ministry of energy and will produce from now on green energy
13.06.2021 In Arac HEPP, where Kochendörfer produced the two Francis turbines and also had generator #TDPS and E-BoP #ERMAF in scope of supply, we have completed the Testing phase and are ready for test.
12.06.2021 Pamukluk HEPP has passed the ministry acceptance where Kochendörfer Hydro produced and supplied the 14,5 MW + 4,8 MW Francis Turbines another nice powerplant equipped with our high quality Kochendörfer Turbine will produce clean energy
11.06.2021 At Meydacik HES the domestic produced Turbine in our own workshop, had been successful commissioned and accepted from the ministry inspectors of Turkey.
10.06.2021 6 nozzle model test ongoing in test bench of University Graz to increase significant our already model tested efficiency for the success of the projects of our clients. GERMAN hydropower TECHNOLOGY
17.05.2021 Final balancing of the first of 4 pcs 3.2 Meter Kochendörfer Kaplan runners which we are currently producing in our facility
16.05.2021 Francis Runner machining for Project in Switzerland with 8,2 MW. Also smaller parts are produced 100 in our own facilities
12.05.2021 Machining of the first part for a new fish friendly Kaplan Runner (1,8 MW) for Powerplant Eddersheim in Germany
19.04.2021 Next 2 Francis turbines (2x 5.2 MW) manufactured in our Factory, are ready for shipment
16.04.2021 First rotation of a Kaplan-S Type turbine which is currently in the stage of workshop assembly at our Kochendörfer factory.
12.04.2021 Mechanical installation of the 2-Nozzle pelton turbine at one of the projects we are working currently completed next step dry tests and then also this unit will produce clean energy
09.04.2021 Francis Runner milling at one of our 5 axis CNC machines in our workshop.
23.03.2021 First of 4 Wicket gate assembly (44 tons) left our workshop today and is on the way to the project site
22.03.2021 Another 2 new 4MW 4 nozzle Kochendörfer Pelton Turbines commissioned at the mountains in the northern part of Turkey.
19.03.2021 Francis, Kaplan and Pelton Turbineswe produce in our own workshops, starting from design, welding,machining,workshop assambly as wellas site installation including commissioning all in one Hand to ensure a high quality product within a reasonable delivery
19.03.2021 Another 6 blade Kaplan runner manufactured in our workshop, which will produce soon clean energy.
16.03.2021 Another Pelton runner completed in our workshop - of course milled out from a forged piece stainless steel material
14.03.2021 This two orange Francis turbines left our Kochendörfer Factory today in order to be installed at Arac HEPP at the Black Sea region of Turkey.
12.03.2021 Next 2 Kochendörfer Francis turbines ready for commissioning
11.03.2021 This Kaplan S Turbine departed today from our factory to Meydancik project site. With a design and production period of just 6 months, our Kochendörfer Team did. Again an amazing job
08.03.2021 Next shipment of the 2 draft tube cones to the project site of Ceyduru HEPP for which we are currently producing 4 Kaplan Turbines (each 5.9 MW) with a runner diameter of 3150 mm.
07.03.2021 Next turbine left our factory today - this time a two nozzle Pelton turbine
06.03.2021 At Duru HEPP in the 4 draft tube-bends are installed and are in the concrete stage now, soon the Kaplan turbines will be shipped and installed
25.02.2021 Faizabad HEPP in Afghanistan at the finalization and Dry-Test stage. Very soon 3 Köchendörfer Kaplan Turbines will generate green energy
23.02.2021 Another draft tube bend left our factory to be installed in the northern part of Turkey 🇹🇷 where we will deliver 4 Kaplan Turbines in the upcoming months.
21.02.2021 Installation started with the first draft tube of 4 in the northern part of Turkey where we deliver 4 vertical Kaplan turbines produced in our facility at
20.02.2021 Last day in freedom for the, from Kochendörfer new developed, designed and produced runner, before our installation team will put it down to it’s final destination.
16.02.2021 Another runner balanced and ready to be installed to produce renewable energy for the next decades 🇹🇷 from design to commissioning - all in one hand
10.10.2019 EIF Fair
Phone Support
0312 504 37 24
E-Mail Support
info@kochendoerfer.com.tr
Cookies are used on this website to provide you with better service. You can review the Website Privacy Policy or KVKK Information Text to change your cookie preferences and get detailed information about Cookies.
Please note that if you change the cookie settings, some features of the website may lose their functionality. X
Ankara / TURKEY
Address
Malikoy Baskent OSB Unal Kocaman St. No:6 Sincan/Ankara/Turkey
 
Phone
+90 312 504 37 24
 
E-mail
info@kochendoerfer.com.tr
 
E-mail
kvkk@kochendoerfer.com.tr
 
E-mail
kochendorfer@hs01.kep.trkochendorferhydroelektromekanik@hs01.kep.tr
 
Sale Support
Phone
+90 537 480 95 00
 
Field Support
Phone
+90 538 253 14 24
 

E-Mail List

Kurumsal Web Sitesi